Glendale, NY - June 10, 2008 -- Beginning July 1, 2008 New York City’s Department of Buildings (DOB) new Construction Code will go into effect. In this new code there will be significant changes to the inspection and filing procedures associated with the annual low pressure boiler inspections. Namely, inspections reported with deficiencies must be corrected, re-inspected and filed with an Affirmation of Correction form within forty-five days of the date of the original inspection.
If you wish to have City Spec perform your re-inspection you must, in the following order:
It is the owner’s responsibility to have the defects remedied in a timely manner and prior to the re-inspection. City Spec does not perform any repair work. City Spec will not be held liable for any violations that result from the owner’s tardiness in making repairs or scheduling a re-inspection with City Spec.
If you have any questions please do not hesitate to call our office: 718-849-4900.
To download or print a copy of the BO-13 Affirmation of Correction form, please visit the DOB: http://www.nyc.gov/html/dob/downloads/pdf/bo13.pdf
To learn more about the new Construction Code please visit the DOB’s website at http://www.nyc.gov/html/dob
<< Previous
Copyright © 2008 City Spec, Inc. A Division of Insparisk. All rights reserved.